Sign up to access all features of our service.
  • Job search
  • Favorites
  • Create a CV
    New
  • Salaries
  • Subscriptions

Master Scheduler: Production & Materials Planning

Inuplands

Draper in Cambridge, MA seeks a Senior Production Planner/Scheduler to own the master schedule, material requirements, and production/labor plans for complex programs. This on-site role partners with engineering, manufacturing, and supply chain to convert demand and material availability into an executable plan, balancing capacity and on-time delivery. Candidates should have 8+ years in production planning, strong ERP/MRP skills (Epicor/Unanet preferred), and familiarity with FAR/DFAR, ITAR, and #J-18808-Ljbffr Inuplands

Vacancy posted 2 days ago
Similar jobs that could be interesting for youBased on the Master Scheduler: Production & Materials Planning in Cambridge, MA vacancy
  • Draper in Cambridge, MA is seeking a Senior Production Planner/Scheduler to own the integrated master schedule. This onsite role partners with...  ...convert demand into a feasible production plan and optimize capacity, material flow, and on-time delivery. You will monitor... 
    Materials

    Draper

    Cambridge, MA
    2 days ago
  • Draper Labs in Cambridge, MA seeks a Master Scheduler to own and drive integrated production schedules on site. You will transform demand and material availability into a feasible plan, balancing capacity, on-time delivery, and inventory to keep the production floor efficient... 
    Materials

    Draper Labs

    Cambridge, MA
    1 day ago
  •  ...Master Pipefitter Category Skilled Trades Position Pipefitter Description About...  ...Benefits: Health, Dental, and Vision Plans 401k with match Paid Time Off (PTO)...  ...quality control procedures. Assist in material takeoffs, procurement, and inventory management... 
    Materials
    Temporary work
    Local area
    Monday to Friday
    Night shift
    Weekend work

    Feeney Brothers Excavation

    Boston, MA
    1 day ago
  •  ...Stark Draper Laboratory, Inc. in Cambridge is seeking a Master Scheduler to own and drive integrated production schedules onsite at the Cambridge facility. You will...  ...with production teams to optimize manufacturing plans and meet program milestones. This senior, hands-on role... 
    Suggested

    The Charles Stark Draper Laboratory, Inc.

    Cambridge, MA
    2 days ago
  •  ...Master SchedulerThe Master Scheduler is responsible for developing, maintaining, and driving execution against...  ...Grey's integrated engineering, production, and deployment schedules. This individual...  ...& ReportingTrack progress against plan.Report critical path, schedule variance... 
    Suggested

    Berkshire Grey

    Bedford, MA
    2 days ago
  •  ...Master Physician Advisor Each year, MedSchoolCoach supports more than a thousand pre...  ...application strategy, competitiveness, career planning, and professional development....  ...descriptions, and residency application materials. Conduct high-level mock interviews and... 
    Materials
    Full time
    Part time

    MedSchoolCoach

    Boston, MA
    1 day ago
  • $3,000 per month

     ...SchedulerKayem's Maintenance Scheduler/Planner serves as the...  ...all maintenance activities planning and scheduling of work (facilities...  ...determine the right parts, materials, tools, and technical skills...  ...activities.Coordinate with production and operations teams to schedule... 
    Materials
    Hourly pay
    Minimum wage
    Full time
    For contractors
    Work at office
    Local area
    Flexible hours
    Night shift

    Kayem Foods

    Chelsea, MA
    2 days ago
  • $103.38k - $129.17k

     ...Braintree, MA, is actively seeking a highly skilled SI&OP Process Owner & Master Scheduler. This role involves coordinating supply chain strategies within military programs, focusing on production planning and cross-functional collaboration. The ideal candidate will have a... 

    Ultra Electronics Group

    Braintree, MA
    12 hours ago
  • $33 - $47 per hour

     ...manufacture of high-quality products that enable...  ...including thermal interface materials, EMI shielding...  ...The Senior Facilities Master Plumber serves as the...  ...preventive maintenance planning, emergency response, and...  ...work execution. Plan, schedule, and execute **preventive... 
    Materials
    Permanent employment
    Temporary work
    For contractors
    Apprenticeship
    Shift work
    Night shift
    Weekend work

    Parker Hannifin Corporation

    Woburn, MA
    2 days ago
  • $150k - $170k

     ...Charles River Associates is seeking a Product Manager / Agile Master to help accelerate the development...  ...prioritized backlogs, agile delivery plans, and measurable outcomes. The ideal candidate...  ..., launch communications, training materials, adoption support, and post‑release... 
    Materials
    Work at office
    Remote work
    Work from home
    3 days per week

    Charles River Associates

    Boston, MA
    2 days ago
  •  ...Physical Education seeks a Manager of School Design and Strategic Scheduling in Boston, MA. The role involves supporting schools in...  ...utilizing resources to achieve instructional goals while building master schedules and addressing operational issues. Ideal candidates will... 

    Young World Physical Education

    Boston, MA
    1 day ago
  •  ...College is seeking a Manager, Program Operations to own the academic planning lifecycle from demand planning to post‑term analysis. You will partner with academic leadership to build data‑informed schedules and coordinate affiliated faculty hiring and onboarding. You... 

    Emerson College

    Boston, MA
    1 day ago
  •  ...team environmentExperience with Primavera P6 tool or Generative Scheduling is a bonusAbility to communicate complex ideas effectively -...  ...these tools and synthesize your findings into McKinsey formatted products. These products may be in the form of complex models and... 
    For contractors
    Apprenticeship
    Easy work

    McKinsey & Company

    Boston, MA
    1 day ago
  •  ...Campus.  The Endoscopy/Gastroenterology Scheduling Nurse knows and understands the...  ...role of the Endo/GI nurse is to assess, plan, implement, evaluate and document patient...  ...Ability to work with detailed confidential material.  Experience with EPIC documentation required... 
    Materials
    Work experience placement
    Local area
    Work from home
    Shift work

    Cambridge Health Alliance

    Somerville, MA
    12 hours ago
  • $108k - $145k

     ...Overview As a Senior Scheduler , you will work with highly experienced, culturally diverse, and passionate teams nurturing a strong...  ...full project scope, milestones and timelines, using critical plan methodology Ensure clear responsibility and ownership for... 
    Work experience placement

    LineSight Inc

    Boston, MA
    5 days ago
  •  ...and cost-effectiveness. The role supports manufacturing production lines, process validation, continuous improvement...  ...Internal Corrective Reports). Utilize SAP for production planning, material management, inventory tracking, and reporting. Collaborate... 
    Materials

    Katalyst Healthcares & Life Sciences

    Cambridge, MA
    2 days ago
  • $92.5k - $100k

     ...research while analyzing client materials to build an understanding of...  ...press; Assist in the production and development of research summaries...  ...Bachelor’s or Master’s degree candidates graduating...  ...insurance; 401(k) retirement plan with employer match; life and... 
    Materials
    Full time
    Apprenticeship
    Work experience placement
    Summer work
    Internship
    Work at office
    Work from home
    3 days per week

    Charles River Associates

    Boston, MA
    2 days ago
  • The Planner/Scheduler is responsible for planning, coordination, and control of all maintenance and operational work execution across East Hanover and associated sites. This role owns CMMS planning outputs, including work order prioritization, backlo

    ABM Industries

    Cambridge, MA
    1 day ago
  • $108.88k - $163.32k

     ...team, accountable for planning, governing, and delivering...  ..., ensuring scope, schedule, dependencies, risks,...  ...making forums by preparing materials, tracking actions and...  ...Knowledge of Master Data Domains and familiarity...  ...strong understanding of product and vendor information... 
    Materials
    Full time
    Work at office
    Local area
    Remote work
    Flexible hours

    Ahold Delhaize USA

    Quincy, MA
    2 hours ago
  •  ...Job Description Data Center Construction Scheduler - Boston, MA This opportunity is with...  ...Scheduler to support scheduling and planning efforts for mission-critical data center...  ..., Corps of Engineers; Air Force – Power Production; Generator Techs; Maritime, Coast Guard,... 
    Remote work

    Pkaza

    Boston, MA
    23 days ago
  •  ...position focused on creating and managing production schedules using ERP systems. This role requires...  ...various departments to ensure timely material delivery and auditing production jobs for...  ...including healthcare, retirement plans, and generous PTO. #J-18808-Ljbffr Ultra... 
    Materials
    For contractors

    Ultra Maritime

    Boston, MA
    2 hours ago
  • $100k - $125k

     ...through all phases (design, construction, and post-occupancy; planning, investigation, implementation, turnover, and persistence).Manage...  ...of relevant experience.Ability to read/understand technical materials (i.e. drawings, specs, etc.).Demonstrated experience in... 
    Materials
    Temporary work

    Colliers Engineering & Design

    Boston, MA
    1 day ago
  • $170k - $315k

     ...that move out of pilot purgatory and into production because the underlying data and...  ...including budget/cost control, business planning, monitoring, and reporting.Partner & Sales...  ...or verification signals in application materials based on available information. These tools... 
    Materials
    Full time
    Shift work

    Mendix

    Boston, MA
    3 days ago
  • $62.5k - $237.5k

     ...Summary:Draper is seeking a Product Manufacturing Engineers who can...  ...strong organizational and planning skills to balance technical,...  ...create product concepts.• Gather materials or resources needed to design...  ....EducationBachelor's or Master's degree in Mechanical Engineering... 
    Materials
    Full time
    Local area

    Draper Laboratory

    Cambridge, MA
    2 days ago
  • $110k - $120k

     ...estimates, and proposal coordinationSupport pre-construction planning, including scheduling, budgeting, risk assessment, and resource...  ...transportation teams to ensure timely delivery of equipment and materials to job sitesServe as the primary point of contact for vendors... 
    Materials
    For subcontractor
    Shift work

    Veralto

    Boston, MA
    3 days ago
  •  ...of our Project Development & Planning group — known internally as "...  ....Lead front-end programming, master planning, concept studies, and...  ...objectives across scope, schedule, and budget.Analyze and develop...  ...operational requirements, people and material flows, adjacency schemes,... 
    Materials
    Full time
    Local area
    Flexible hours

    Barry-Wehmiller

    Boston, MA
    3 days ago
  •  ...world-class creativity, next-generation production, transformative enterprise solutions and...  ...Bring:Project Management Expertise:Adept at planning, executing, and delivering multiple...  ...production w/ familiarity across various material substrates (plastics, metals, woods, papers... 
    Materials
    Full time
    Work at office

    Pep Promotions

    Boston, MA
    3 days ago
  •  ...seasoned Software Engineering Manager, Motion Planning to lead and expand our motion planning...  ...planning innovation from concept to production in fast-paced, real-world logistics...  ...or verification signals in application materials based on available information. These tools... 
    Materials
    Work at office

    Pickle Robot Company

    Charlestown, MA
    a month ago
  • $213k - $280.5k

     ...restore full-length protein production in diseases caused by premature...  ..., cross-functional plans, timelines and budgetsIdentify...  ...Communications CommitteeManage schedule, agenda, and content for Leadership...  ...preparation of presentation materials, supporting diligence activities... 
    Materials

    Seres Therapeutics

    Cambridge, MA
    1 day ago
  • $75k - $237.5k

     ...are all a plus.The Principal Product Engineer develops novel solutions...  ...product concepts.• Gather materials or resources needed to design...  ...strong organization, planning, and time management skills to...  ...demands.EducationBachelor's or Master's degree in Mechanical Engineering... 
    Materials
    Full time
    Local area

    Draper Laboratory

    Cambridge, MA
    4 days ago

Do you want to receive more vacancies?

Subscribe and receive similar vacancies to Master Scheduler: Production & Materials Planning. Be the first to apply!