Sign up to access all features of our service.
  • Job search
  • Favorites
  • Create a CV
    New
  • Salaries
  • Subscriptions

Construction Manager

Falken Industries LLC

Job Description

Job Description:\n\nDescription: Job Req for Construction Manager San Jose, California Period of Performance October 1, 2024 through February 1, 2025 Construction Management Services (CM) Record Keeping and Progress Report / Project Files The CMa will set up job files, working folders, and record keeping systems to be used on this project. The CMa will update and complete the Inspection Plan to fit complete contract requirements in detail as directed by the CO/COR. The CMa is responsible for documenting all the major project actions, contract modifications, claims, submittals, etc. The project files must be well organized. The CMa files shall include sections for: General Correspondence (CMa-GC) Administrative Correspondence GSA Correspondence Correspondence with A/E Inspection Reports Defects and Omissions Lists Submittals Organized by Specific Section and Submittal Logs Wage Interviews Commissioning Reports Change Order Documents (Requests for Proposals), SF2437 Finding of Facts, Scope of work, Independent Estimates, GC Proposals, Technical Analysis and Negotiation Memorandum. Shop Drawings, Catalog Cuts Job Meetings with Sign-In Sheets Requests for Information (RFI) RFI with GSA or A/E Response and RFI Logs Payments Scheduling Oversight The CMa shall review the construction schedules submitted by the GC’s and make recommendations for acceptance, revision, or rejection by the GSA Contracting Officer (CO). The CMa shall verify that each activity is reasonably priced, that the schedule is not front-end loaded, and that the workflow is logical, efficient, and not contrived to neither unfairly benefit the Contractor nor jeopardize the Government. The CMa shall be overseeing the progress achieved by the GC and compare the actual progress to the master project schedule. The CMa must be continuously aware of the status of each actual project progress as compared to the planned progress. The oversight by CMa should take into consideration of progress payments, receipt of submittals, phasing, or any other sensitive activities. The CMa shall annotate the progress schedule monthly showing actual progress achieved and any adverse delays. The CMa shall anticipate delays and advise GSA when problems are predicted. The CMa shall highlight such matters in the weekly construction meetings. Submittals The CMa is responsible for coordinating submittals from receipt through approval and for returning them to the GC. The CMa shall review the submittal schedule, as developed by the GC, for reasonableness. The CMa should review the submittal package for completeness and compliance with the specification prior to forwarding on the the A/E team for review. The CMa shall monitor the GC’s submittal progress, reminding the GC of pending and delinquent submittals. If submittals are not being submitted or reviewed in a timely manner by the GC, the CMa shall notify GSA. The CMa’s submittal monitoring system should include as a minimum: The CMa is responsible for coordinating the submittals from their receipt through to their approval and return to the GC. The CMa will monitor the time of submission and the processing of shop drawings, samples and other separate Contractor submittals. If submittals are not being received in a timely manner, the CMa shall ascertain the reason therefore and take action as deemed appropriate to eliminate lags and delays. The CMa shall notify the CO promptly of any delays of the Contractor. The CMa will ensure that all submittals are submitted and approved in sufficient time to preclude delaying project completion. Progress Payments The CMa shall assist GSA in processing payments by reviewing the GC’s payment invoices and recommending to the GSA project manager the correct payment amount. The CMa shall work with the GC before the invoice is prepared, so that both parties agree on the amount of work completed and the correct amount of the invoice. Actual approval of the payment amount shall be made by the GSA CO. The CMa shall follow GSA’s procedure for progress payment review and processing, including ensuring the GC’s adherence to FAR Clauses 52.232-5, Payments Under Fixed-Price Construction Contracts (May 2014), and 52.232-27, Prompt Payment for Construction Contracts (May 2014). The CMa shall also review the GC’s Schedule of Values (SOV) to ensure that the information is correct and that the SOV is not front- loaded. The CMa is responsible for reviewing the GC’s proposed SOV at the beginning of the project and for making recommendations to GSA concerning revisions and/or acceptance. The CMa shall also verify that there is an appropriate line item with funding for project closeout since GSA does not typically hold retainage on invoices. Safety The CMa shall become familiar with the provisions of the Public Buildings Service (PBS) Handbook No. PBS P 5900.2C, Safety and Environmental Management Program. During the course of construction, the CMa shall monitor the GC’s conformance to the project safety plan. The CMa shall advise the GC immediately of any safety hazards observed. IF the remedy to a safety hazard is not apparent, the CMa may assist the GC in developing a corrective action plan. The CMa shall maintain a file of all accident and fire safety reports generated by the GC. Accident and Fire Reporting: In the event of an accident or fire, the GC, the CMa, or others familiar with the circumstances will be required to prepared and submit to GSA: GSA Form 3090, Accident Investigation Report GSA Form 53, Fire Accident Report Inspection The CMa shall be responsible for the inspection of all worked performed by the GC and for promptly notifying the GC, and the GSA CO of any discrepancies. The CMa shall plan and coordinate inspections with the GC in a manner that minimized impacts on construction operations and shall confirm that critical inspections occur as required. Inspections of critical activities may require that the GC notify the CMa and GSA in advance of certain operations. The CMa shall document and record each inspection either in a stand-alone inspection report, or within the CMa daily report. Testing The CMa must be aware of all construction elements or activities that require tests, as reflected in the construction contract. The CMa’s testing responsibilities include, but are not limited to: Verifying that tests are being conducted as scheduled Witnessing all tests to confirm that proper testing procedures are followed Monitoring test results for acceptability Retaining records of tests and results Documenting testing activities Notifying GSA of test failures and of planned correction and retesting Overseeing corrective measures arising from test failures The CMa will be held responsible for costs for retests that are not necessitated by the CMa’s failure to witness required tests. Requests for Information The CMa is responsible for coordinating RFI’s between GSA and the GC The CMa shall develop and coordinate a procedure for tracking RFIs so that all parties understand and agree to their roles and responsibilities. The CMa reviews RFIs and determines whether a response can be drafted based on a review of the contract documents. The CMa may refer the RFI to the A/Es for technical clarifications or to GSA for clarifications of general conditions. The CMa shall also assist in providing responses to RFIs related to general conditions. All RFIs relating to fire protection shall be routed to the A/E and the GSA fire protection engineers for review and response. The CMa shall develop procedures to notify all parties (the GC and GSA) of RFI responses, fully document all RFI responses, and confirm that all parties agree with the contract interpretation. The CMa shall review all RFI responses to determine whether the response will result in a change order to the GC contract. If the RFI will result in a change order to the GC contract, the CMa shall notify the GSA CO and COR to coordinate the proper response. Contract Modifications The CMa shall assist the CO in administration of changes to construction contracts. The CMa must not take any action that commits the Government to funds and should avoid any instruction to the contractor that could be interpreted as authorizing modifications to the contract. All modifications to the contract must be processed as formal contract modifications by the GSA CO. The GSA CO has the sole authority for authorizing contract modifications. a. Change Order Requests: The CMa shall evaluate all potential modifications to determine whether they are justified and within the scope of the GC contract, consulting as necessary with the Design-Bid-Build team on technical issues or with the GSA general conditions. The CMa may also assist in developing customer driven changes to the SOW. b. Requests for Proposals: If the CMa find a change order request justifiable, the CMa shall prepare a request for a change order proposal from the GC for signature by both the CO and COR. The CMa will be required to prepare a written description of the scope of the change. c. Design Deficiencies: If the reason for a change appears to be a design deficiency, the CMa should make an initial assessment of the Design-Bid-Builds’ Team liability, including documentation of the deficiency. The CMa’s assessment of the Design-Bid-Build’s Team liability will be based on a review of the contract documents and other circumstances leading to the change. The GC shall be given an opportunity to rebut any determinations of apparent design deficiencies. The GC’s position on the deficiency shall be provided to the GSA CO and the COR with the proposed contract modification. GSA shall make the final decision on liability and also on whether to pursue recovery from the GC. d. Estimates: The CMa shall prepare an independent estimate of the change and the GC’s subcontractors’ overhead and profit. The contract has all rates, prepare estimate based on these rates. The estimate shall include a detailed breakdown of labor, material, and equipment costs for the various work elements. Markups for overhead and profit, as allowed by the GC contract, will be shown separately. The estimate must be signed and dated by the preparer. The absolute sum of all cost components in a modification (additions and deductions) will determine the GSA internal approval process required for the cost estimate before acceptance by the GSA CO. The Government estimate is to be prepared before receipt of, and independent of, the GC’s proposal. e. Price-to-be-Determined-Later (PDL) Modifications: Some modifications must be expedited in order to avoid delaying construction or increasing costs excessively. In such cases, the modifications may be processed as a PDL. The GSA CO will decide if circumstances warrant expedited PDL procedures. f. CO Directed Change Orders: FAR Clause 52.243-4, Changes, authorizes a CO to issue a written order to the contract unilaterally directing changes in the work, within the general scope of the GC contract; including changes in the specifications or drawings, in the method of performance, in Government furnished facilities or equipment, in materials, in services, in site, or in directing acceleration of the performance of the work. g. Negotiations: The CMa shall determine if a change will potentially extend or shorten the specified construction completion date; include an estimate of appropriate time extension for all change orders; the CMa shall review all proposals received from the GC and develop a technical analysis. The technical analysis is an in-depth evaluation of the GC’s proposal, especially as it compares to the Government Estimate. It identifies questionable costs; excessive unit costs; differences in scope, quantities, or markups; and suggests negotiation strategies; the CMa shall assist the GSA CO/COR in establishing negotiation strategies, including negotiation cost targets or range and in negotiating contract modifications with the GC. The initial analysis should provide recommendation for acceptance or recommendations for negotiations, identifying specific negotiation objectives and cost targets or range. The CMa will support the CO/COR in the negotiations, being most familiar with the field conditions generating the change and having prepared or reviewed the IGE and having prepared a technical analysis that compares the IGE to the GC’s change order proposal. GSA will provide necessary on site representation to avoid impact on change order procedures with reasonable notice and/or scheduling. h. Documentation: After negotiating a firm-fixed prices, the CMa shall assist GSA by preparing a revised Technical Analysis based on the final negotiated amount. Progress Photographs The CMa shall photograph any work that will become hidden or covered up during the course of construction. Photos shall be labeled to indicate the project, the date taken, and what is being shown. Prior to the commencement of construction, the CMa shall photograph all existing areas surrounding the construction area that may become damaged during construction in order to provide a record of the conditions at the start of the work. Project Closeout – Final Inspection, Substantial Completion, and Final Completion The CMa shall schedule and coordinate the Final Inspection and punch list with GSA, the architect of record, and the FBI. The CMa shall have a running list of Defects and Omissions (DOs) that can be combined with the DOs identified in the Final Inspection. The CMa transmits the preliminary DO list (also referred to as the Punch List) to the GC and GSA. The CMa shall closely monitor the corrective work and update the list of DO, signing off each deficiency as it is corrected. The CMa shall prepare a project specific checklist of the items contractually required before the contract can be considered ready for settlement. The CMa shall assist the GSA CO to determine when all contractual obligations are met, and the project is ready for final completion and acceptance. Meetings and Coordination The CMa shall chair design meetings, progress meeting, coordination meetings, and required project meetings as soon as the CMa is on board through final closeout of all construction activity. The CMa shall produce and distribute meeting minutes within three (3) business days of the meeting. The CMa Shall schedule and chair coordination meetings as required to ensure construction activities. The CMa shall provide both informal and formal coordination meetings with the parties on site. As Built Drawings Verify the accuracy and completeness of all as-built drawings and ensure the contractor maintains and updates the drawings on a regular basis and include all actual locations and routings of services, all changes from the original documents, filed changes, final details, actual dimensions and other similar items on the drawings. The CMa and the construction contractor will work collaboratively to ensure that as-built and other “Controlled Unclassif

Vacancy posted more than 2 months ago
Similar jobs that could be interesting for youBased on the Construction Manager in San Jose, CA vacancy
  • $131.5k - $189.3k

     ...create a brighter, more sustainable future while tackling the most pressing challenges of the 21st century.We are looking for a Construction Manager to join our team in one of today’s most exciting technologies. This role will report to the Sr. Manager Construction... 
    Suggested
    Full time
    For contractors
    Work at office
    Worldwide

    Bloom Energy

    San Jose, CA
    3 days ago
  • $135k - $175k

     ...industry, join our team as we help shape a brighter way forward. Senior MEP Construction Project ManagerWhat this job involves:We are currently seeking a Senior MEP Construction Project Manager to deliver Corporate Real Estate (CRE) technology projects for our clients within... 
    Suggested
    Full time
    Local area

    Jones Lang LaSalle

    Santa Clara, CA
    4 days ago
  •  ...public safety, sustainable and resilient communities and quality of life. We bring together planners, engineers, architects, construction management staff, environmental, strategic communications, economists, management consultants and specialists across disciplines to... 
    Suggested
    Weekly pay
    Daily paid
    Temporary work
    For contractors
    Work experience placement
    For subcontractor
    Work at office
    Local area

    HDR

    San Jose, CA
    10 hours ago
  • $100k

    Under general supervision of the Project Director and Project Manager, the Site Superintendent supervises the field construction of the Project, including its organization, planning, and scheduling, in order to complete the work on time, within the budget, and to the quality... 
    Suggested
    Full time
    For contractors
    Local area
    Monday to Friday
    Flexible hours

    Construction Management & Development Inc

    Milpitas, CA
    9 days ago
  •  ...Construction Project Manager (Temporary Contract) Location: Los Gatos, CA Duration: 4-5 Month Engagement Rate: DOE Job Summary: The Construction Project Manager will help oversee and manage a 100,000 sqft residential housing construction project... 
    Suggested
    Temporary work
    For subcontractor
    Local area

    Essel

    Los Gatos, CA
    1 day ago
  • $130k - $170k

     ...single-source facility solutions. Our offerings include commercial MEP solutions, sheet metal construction, preventive maintenance and service, building automation, energy management, and more. Job Summary Air Systems is seeking an experienced Construction Project... 
    Contract work
    For subcontractor
    Work at office
    Remote work
    Flexible hours

    Emcor UK

    San Jose, CA
    1 day ago
  • $50 - $100 per hour

     ...candidate has a proven track record of project engineering and civil construction work. They thrive in a fast paced and a team oriented...  ...and execution, Quality control, Quantity tracking, Budget management, Financial reporting and forecasting, Cash flow management, Scheduling... 
    Hourly pay
    Contract work
    For contractors
    Relocation package

    JLM Strategic Talent Partners

    San Jose, CA
    3 days ago
  • $120k - $150k

     ...those who want to keep growing, learning, and evolving. We at Kelly® hear you, and we're here for you! We're seeking a Construction Project Manager to work at a leading organization in San Jose, CA. Sound good? Take a closer look below. You owe it to yourself to consider... 
    Temporary work
    For contractors
    Work at office
    Local area
    Monday to Friday
    Shift work

    kelly company

    San Jose, CA
    3 days ago
  • $45 - $55 per hour

     ...Role  Want to lead projects inside some of the world's most advanced semiconductor manufacturing facilities?  As a Construction Project Manager with Technical Safety Services (TSS), you'll oversee Gas Life Safety System (GLSS) construction projects that help protect... 
    Full time
    For contractors

    Technical Safety Services

    San Jose, CA
    17 days ago
  •  ...Role Summary: As a Project Manager, you will provide overall direction and leadership for moderately complex projects or major segments of large-scale construction builds. You are responsible for the full implementation, operation, and administration of projects while... 
    Contract work
    For contractors
    For subcontractor
    Relocation

    Macpower Digital Assets Edge

    Santa Clara, CA
    5 days ago
  •  ...Jensen Landscape Construction in Milpitas, CA, is seeking a Senior Project Manager to oversee commercial landscape projects from inception to completion. You will manage scope, budget, schedule, quality, safety, and client satisfaction while ensuring contractual compliance... 

    Monarch Landscape Companies Defunct

    Milpitas, CA
    3 days ago
  • $126.6k - $183.4k

    ## Construction Senior Project ManagerApplyremote type: Remotelocations: San Jose, CA: Fresno, CAtime type: Full timeposted on: Posted Yesterdayjob...  ...way forward.**What this job involves:** The **Senior Project Manager** role involves leading cross-functional teams to manage... 
    Contract work
    For contractors
    Work at office
    Local area
    Remote work

    Jones Lang LaSalle Incorporated

    San Jose, CA
    5 days ago
  • $148.8k - $186k

     ...join us in our pursuit of building perfection. Role Summary The Project Manager 2 will provide overall direction and leadership on moderately complex projects, or a portion of large construction projects. This position will fully implement and manage the operation and... 
    Contract work
    For subcontractor
    Relocation

    JE Dunn Construction

    Santa Clara, CA
    3 days ago
  • $120k - $160k

     ...Job Description Job Description We are seeking an experienced Construction Fleet Manager to oversee our comprehensive fleet operations, equipment maintenance, and daily shop logistics. This is a hands-on leadership position responsible for ensuring our mixed fleet... 
    Full time
    Work experience placement
    Work at office

    Anderson Pacific Engineering Construction, Inc.

    Santa Clara, CA
    27 days ago
  • $252k - $270k

    The Senior Construction Manager provides overall direction to Webcor projects regarding professional standards, quality, safety, performance, and accountability.ESSENTIAL FUNCTIONS AND DUTIESRepresent the company to owners, architects, subcontractors, and other professionals... 
    Permanent employment
    Full time
    Contract work
    Temporary work
    For subcontractor
    Local area

    Webcor Builders

    San Jose, CA
    4 days ago
  • $84.7k - $121k

     ...education, or career path, if you share our vision to create extraordinary experiences, you belong at HITT. Commercial Construction Assistant Project Manager Job Description: An Assistant Project Manager (APM) obtains, evaluates, coordinates and distributes the... 
    For contractors
    Work experience placement
    For subcontractor
    Work at office
    Local area

    HITT Contracting

    Santa Clara, CA
    5 days ago
  • $80k - $120k

    Construction Manager - DAS/BTS $80000 - $120000 per year | Inglewood, CA | On-site | Permanent Ever managed DAS inside a stadium where 70,000 fans are counting on the network? This is that role. You’ll be home‑based out of one of the most iconic NFL venues in the country... 
    Permanent employment
    Local area
    Work from home
    Worldwide

    Australia-Employment

    Santa Clara, CA
    2 days ago
  • $60 - $61.33 per hour

     ...$60.00 - $61.33 hourly Job Overview: 2-4 years of commercial construction project work. Working on smaller projects to get the overall bigger...  ...labs, someone who can work independently. As a Project Manager, you will play a pivotal role in delivering exceptional project... 
    Hourly pay
    Contract work

    Dexian

    Santa Clara, CA
    2 days ago
  • SERVPRO of Palo Alto is looking for a Construction Manager! Benefits Competitive compensation Superior benefits Career progression Professional development And more! As a Construction Manager with SERVPRO of Palo Alto, you will be responsible for ensuring the highest... 
    Local area

    ServiceMaster Clean of Fraser Valley

    Milpitas, CA
    2 days ago
  • $140k - $185k

     ...sustainable housing solutions throughout California, our group manages an extensive and growing portfolio of assets and development...  ...AL Homes Inc. , a brand of AlphaX RE Capital. We are seeking a Construction Manager (Single-Family Homes) who will be responsible for managing... 
    Full time
    For subcontractor
    Work at office

    AL Homes

    Cupertino, CA
    2 days ago
  • $130k - $150k

     ...member of their team. They place a high value on producing quality results for their customers. We are currently seeking a Construction Manager in the Bay area of Northern California who has a strong background in large projects. The ideal candidate will thrive on our... 
    Work experience placement
    For subcontractor

    Blue Ridge Executive Search

    San Jose, CA
    10 hours ago
  • $125k - $140k

    OverviewWe are Vantis, the construction division of One Workplace. We’ve committed ourselves to re-imagining the entire construction process...  ...work is proceeding on schedule and within budget. Supervises, manages and mentors on-site project personnel. Ensures project... 
    For contractors
    Work experience placement
    For subcontractor
    Work at office
    Local area
    Weekend work

    One Workplace

    Santa Clara, CA
    10 hours ago
  •  ...position is also responsible for all phases of the design and/or construction process of moderately complex construction and/or...  ...of time, money, physical objectives and outside constraints; managing the work of project team(s) comprised of facility personnel, project... 
    Contract work
    For contractors

    Kaiser Permanente

    San Jose, CA
    10 hours ago
  • $80k

     ...is seeking an experienced and motivated Installation Project Manager to help us build our San Jose, California Production team. The...  ...satisfaction and ensure all documentation is completed. Construction/Installation Manager Experience: ~4 to 5 years of progressive... 
    For contractors
    For subcontractor
    Immediate start

    Jacuzzi Group

    San Jose, CA
    a month ago
  •  ...leader is also responsible for all phases of the design and/or construction process of complex construction and/or refurbishment projects,...  ...; negotiating with local and state jurisdictions; leading and managing the timely procurement of all permits required by regulatory... 
    Contract work
    For contractors
    Local area

    Kaiser Permanente

    San Jose, CA
    10 hours ago
  • $73 - $78 per hour

    We are actively seeking an experienced Construction Project Manager for an immediate backfill on a high-visibility project. This is a fully onsite role supporting multiple capital projects with strong potential for extension. Location: San Jose, CA (100% onsite) Pay Rate... 
    For contractors
    Immediate start
    Flexible hours

    The Fountain Group

    San Jose, CA
    2 days ago
  • Description Prime Residential’s (Prime) Construction Project Managers are responsible for oversight and successful execution of capital improvement and construction projects from inception to completion across Prime’s diverse multifamily residential real estate portfolio... 
    Contract work
    For contractors

    primegrp.com

    San Jose, CA
    2 days ago
  • $70k - $90k

     ...while providing exceptional customer service throughout the insurance claim and reconstruction process. Job Summary The Construction Project Manager is responsible for managing residential and commercial reconstruction projects from estimate approval through final... 
    For contractors
    For subcontractor
    Monday to Friday
    Afternoon shift

    iicrc-careers

    San Jose, CA
    2 days ago
  • Landmark Builders is one of the Bay Area’s Premier Construction Companies. We are a General Contractor specializing in commercial construction...  ..., Tenant Improvements, and Seismic/Structural Work. The management of the firm is dedicated to maintaining an energizing work... 
    For contractors
    Work experience placement
    For subcontractor

    Landmark Builders Inc.

    San Jose, CA
    2 days ago
  • $120k - $150k

    We’re seeking a Construction Project Manager to work at a leading organization in San Jose, CA. Salary: $120,000 - $150,000 per year Shift: 5-day work week Monday to Friday, 9:00 a.m. - 5:30 p.m. Why you should apply to be Construction Project Manager: Competitive... 
    For contractors
    Work at office
    Local area
    Monday to Friday
    Shift work

    Kelly Services

    San Jose, CA
    2 days ago

Do you want to receive more vacancies?

Subscribe and receive similar vacancies to Construction Manager. Be the first to apply!