Sign up to access all features of our service.
  • Job search
  • Favorites
  • Create a CV
    New
  • Salaries
  • Subscriptions

Mfg Eng Resource Planner III (Manufacturing Technology Center)

Textron Systems

Description· Under the general supervision of a supervisor or an employee of equal or higher rank, Mfg. Eng. Resource Planner III is responsible for administering effective allocation of manufacturing resources for process planning creation and maintenance.· Responsible for BOM consumption, Computer Aided Planning (CAP) routing creation and manufacturing items orders for manufacturing operations in Bell business systems.· When a Manufacturing Computer Aided Design (MCAD) model exists, responsible for creation and maintenance of manufacturing instructions (drawings & modeling).· Must have knowledge of shop production and processing operations.· Work in accordance with management strategies and concepts as well as program and departmental processes and procedures using Bell Business Systems.· May train one or more employees.Worked Performed:· Interrogate, analyze, comprehend, and interpret various Engineering Drawings, Models, Bills of Materials, Technical Specifications, Quality Documents, Bell Process Framework, and departmental procedures as necessary to perform assigned work.· Responsible for accurate BOM management and consumption for manufacturing operations.· Create and maintain proper work sequence documentation and CAP routings.· Responsible for creating manufacturing items orders/requests including but not limited to NC Programs, Tools/Fixtures, and Gages.· Provide process planning support to manufacturing operations through production order maintenance, tool maintenance requests, and various other planning liaison functions.· Responsible for creating and maintaining applicable dimensional charts, manufacturing instructions (text based and 2D/3D format), material operation diagrams and ply tables as required.· When a Manufacturing Computer Aided Design (MCAD) model exists, responsible for creation and maintenance of manufacturing instructions (drawings & modeling).· Working knowledge of Loft, Engineering, Tooling, Manufacturing and Planning processes and procedures· Skilled in the concept related to the application of GD&T/Aerospace tolerances Supports producibility assessments when requested.· Maintains records and schedules of work assigned. Will meet established company cost control standards, schedule and qualify requirements to maintain market competitiveness.· Provide technical assistance to procurement and suppliers as determined by management.· Execute strong communication skills, both verbal and written, required to communicate and interact between internal and external customers.· Apply extensive aircraft manufacturing knowledge and be prepared to train, direct, instruct, and check/validate Production Engineering work.· Required to attend training and complete competency-based testing as required by management to remain current with technological advancements.QualificationsExperience & Other Requirements:· Two (2) years college or two (2) years of experience in the aircraft industry or completed related Bell apprentice program.· Demonstrated capability to adequately perform the essential functions and responsibilities related to the application of GD&T/Aerospace tolerances· Demonstrated experience in technical writing or experience utilizing technical writing in an aerospace/manufacturing environment.· Demonstrated computer proficiency in planning software, Microsoft Office Suite, ERP/MRP software, tool design repositories, and CAD software.· Preferred demonstrated experience in manufacturing composite or metallic materials.· Preferred experience in machined parts.· Must have strong communication skills, both verbal and written.This position requires use of information which is subject to the International Traffic in Arms Regulations (ITAR). All applicants must be U.S. persons within the meaning of ITAR. ITAR defines a U.S. person as a U.S. Citizen, U.S. Permanent Resident (i.e. 'Green Card Holder'), Political Asylee, or Refugee.Textron is an Equal Opportunity Employer (M/F/D/V)Job Field: ManufacturingJob Type: StandardSchedule: Full-timeShift: First ShiftJob Level: Individual Contributor

Vacancy posted 2 days ago
Similar jobs that could be interesting for youBased on the Mfg Eng Resource Planner III (Manufacturing Technology Center) in Fort Worth, TX vacancy
  • Mfg Eng Resource Planner III (Manufacturing Technology Center) Job Number: 340856 Responsibilities Administer effective allocation of manufacturing resources for process planning creation and maintenance. Manage BOM consumption and create manufacturing item orders in... 
    Suggested
    Permanent employment
    Apprenticeship
    Work at office

    Cessna Aircraft Company

    Fort Worth, TX
    3 days ago
  •  ...equal or higher rank, administer effective allocation of manufacturing resources for process planning creation and maintenance. Responsible...  ...based testing required by management to remain current with technological advancements. Qualifications Two (2) years of college... 
    Suggested
    Permanent employment
    Apprenticeship
    Work at office

    Bell Flight

    Fort Worth, TX
    3 days ago
  • Textron in Fort Worth, TX seeks an experienced Mfg Eng Resource Planner III to allocate manufacturing resources for process planning. You will manage BOM consumption, create CAP routings, and maintain manufacturing items orders, NC programs, tools and Gages. You will support... 
    Suggested

    Textron

    Fort Worth, TX
    1 day ago
  • Cessna Aircraft Company is seeking a Manufacturing Engineering Resource Planner III at the Manufacturing Technology Center. You will allocate resources for process planning, manage BOM consumption, and create manufacturing orders in Bell systems, while interpreting drawings... 
    Suggested

    Cessna

    Fort Worth, TX
    3 days ago
  • Bell Flight is seeking a Manufacturing Process Planner in Fort Worth, Texas. Applicants should have strong experience in aircraft manufacturing...  ...software. The role encompasses allocating manufacturing resources effectively, creating and managing BOMs, and providing training... 
    Suggested

    Bell Flight

    Fort Worth, TX
    1 day ago
  •  ...advanced metal and magnet manufacturing. Our products include...  ...next-generation technologies in robotics, automation...  ...Overview:The Project Planner Scheduling Lead will...  .... Contact Human Resources Department at 702-625...  ...1700 South Pavilion Center Dr. 8th Floor, Las Vegas... 
    Permanent employment
    For subcontractor
    Work at office

    MP Materials

    Fort Worth, TX
    2 days ago
  • Bell Textron Inc. Fort Worth is seeking a Manufacturing Engineer Resource Planner III to allocate manufacturing resources for process planning and maintenance. You will handle BOM consumption, CAP routing creation, and manufacturing orders in Bell systems. When MCAD models... 

    Bell Flight

    Fort Worth, TX
    1 day ago
  • WHO WE ARE: Simpli.fi provides marketing technologies, solutions, and workflow automation for...  ...WE’RE LOOKING FOR:As Local Account Planner of the sales organization, the primary...  ...regionFacilitate & coordinate with Training resources to ensure on-going training.Serve as... 
    Full time
    Work at office
    Local area

    Simpli.fi

    Fort Worth, TX
    3 days ago
  • $79k - $158k

     ...that puts the customer at the center of everything we do. For...  ...this role: The Materials Planner ensures timely availability...  ...for production at a Carrier manufacturing facility, managing requirements...  ...Notice ( . Use of AI Technology-enabled tools may support parts... 
    Temporary work
    Local area

    Carrier

    Fort Worth, TX
    4 days ago
  •  ...Title - Production Planner Ft. Worth, TX Onsite Must have extensive experience with Production Planning Other core...  ...Spyglass Partners excels in placing contract and direct-hire resources across all aspects of IT, Accounting & Finance, Sales, and Executive... 
    Contract work
    Temporary work

    Spyglass Partners LLC

    Fort Worth, TX
    3 days ago
  •  ...to protect our planet's most valuable resource. What we do: For 150 years, Watts...  ...innovation, working with cutting-edge technology to provide smart and connected, sustainable...  ...within assigned categories to ensure manufacturing can produce as planned. Maintains appropriate... 
    Permanent employment
    Full time
    Internship
    Work at office
    Local area
    Monday to Friday
    Flexible hours

    Watts Company

    Fort Worth, TX
    4 days ago
  • Black & Veatch Corporation is seeking a Senior Water Resources Engineer to lead stormwater planning and design initiatives across multiple Texas offices and other U.S. locations. The role emphasizes growth, client engagement, and integrated planning with cross-functional... 

    Black & Veatch Corporation

    Fort Worth, TX
    4 days ago
  • $64.5k - $129.5k

     ...workforce that puts the customer at the center of everything we do. For more...  ...the production schedules at a Carrier manufacturing facility, ensuring execution of the plan...  ...Applicant Privacy Notice.**Use of AI**Technology-enabled tools may support parts of the... 
    Temporary work
    Local area

    Carrier

    Fort Worth, TX
    2 days ago
  • $65.8k - $98.8k

     ...be at the forefront of many technological advancements in our nation's...  ...authors, supply personnel, planner/schedulers and leaders to achieve...  ..., or Maintenance Operation Center (MOC) experience Experience...  ...Operations Job Code Manufacturing Manufacturing Affiliate Sponsor... 
    Contract work
    Work at office
    Relocation
    Flexible hours

    VetJobs

    Fort Worth, TX
    2 days ago
  • $116.2k - $291.1k

     ...energizes clients' business functions and technology to maximize value in Supply Chain...  ...organizations transform planning, sourcing, manufacturing, and fulfillment capabilities to drive...  ...your inquiries to the Global Call Center (GCC) at ****@*****.***.... 
    Local area

    Deloitte

    Fort Worth, TX
    1 day ago
  • Location: Medical Center Office Building (901 7th Ave) Department: CPE, ELearning, Media Serv Shift: First Shift (United States of America...  ...us to blaze new trails in medical care, research, advanced technology, as well as programs and initiatives that benefit children who... 
    Work at office
    Shift work
    Day shift

    Cook Children's

    Fort Worth, TX
    1 day ago
  • JMD Technologies Inc. in Fort Worth, TX seeks a supply chain planner to support production planning, material flow, inventory control, and scheduling for manufacturing operations. You will coordinate cross-functional teams to meet production commitments and customer demand... 

    JMD Technologies Inc.

    Fort Worth, TX
    2 days ago
  • $25 per hour

     ...Division: Solutions  Job Posting Title: Planner - 117209  Time Type: Full Time To...  ...fast-paced warehousing or distribution center environment. Wave Planning & Distribution...  ...with DSV, please contact Human Resources at ****@*****.*** . If you are interested... 
    Hourly pay
    Full time
    Local area

    Schenker & Co AG

    Fort Worth, TX
    4 days ago
  • $106.1k - $187.11k

     ...Multi-Functional Manufacturing Planner Manager (Level 5)At Lockheed Martin Aeronautics, we design, build, and sustain some of the world's most advanced aircraft. As a Multi-Functional Manufacturing Planner Manager (Level 5) in Fort Worth, TX, you will lead Production Control... 
    Full time
    Temporary work
    Work experience placement
    Work at office
    Flexible hours
    Afternoon shift

    Lockheed Martin Corporation

    Fort Worth, TX
    2 days ago
  •  ...have you on the journey. Do we have your attention? Keep reading. D Technology, a ProMach company, is looking for a Planner to support our Machinery Manufacturing team in Fort Worth, Texas. This role is responsible for planning and coordinating production... 

    Pro Mach

    Fort Worth, TX
    22 hours ago
  • Trail Drive Management Corp. (TDMC) seeks an experienced Event Manager to support the Will Rogers Memorial Center operations in Fort Worth, TX. You will oversee events from conception through completion, coordinating décor, catering, entertainment, transportation, and... 
    Flexible hours
    Night shift

    Trail Drive Management Corp.

    Fort Worth, TX
    1 day ago
  • $100k

     ...underpinned by its expansive portfolio of grid-connected land and data centers in renewable-rich regions across the U.S. and Canada. The...  ...retirement offerings Bachelor’s degree or higher in Human Resources or closely related field or equivalent professional experience... 
    Daily paid
    Full time
    Temporary work
    Live out
    Relocation package
    Night shift

    Iris Energy

    Fort Worth, TX
    3 days ago
  •  ...maintain the base data on system including item master and operation BOM effective data, performs weekly item master audits.For End of Manufacturing (EOM) materials control, prepare reports and collaborate with fulfillment and other company sites for the disposition of... 

    Employee Magnets

    Fort Worth, TX
    2 days ago
  • $18 - $20 per hour

     ...Job Full Description Position: Production Planner Pay: $18-20/hr Position Responsibilities: Plan and schedule...  ...or material constraints. Coordinate with Purchasing, Manufacturing, Engineering, Customer Service, and Materials. Support... 
    Weekly pay
    Work at office
    Monday to Friday

    Express Employment Professionals Defunct

    Fort Worth, TX
    2 days ago
  • $79k - $158k

     ...that puts the customer at the center of everything we do. For...  ...this role: The Materials Planner ensures timely availability...  ...for production at a Carrier manufacturing facility, managing requirements...  ...Notice . Use of AI Technology-enabled tools may support... 
    Temporary work
    Local area

    Carrier World

    Fort Worth, TX
    15 days ago
  •  ...planning, material flow, inventory management, and scheduling for manufacturing operations. The role coordinates cross-functional activities...  .... Strong communication, problem-solving, adaptability, and continuous-improvement mindset. #J-18808-Ljbffr JMD Technologies Inc.

    JMD Technologies Inc.

    Fort Worth, TX
    3 days ago
  •  ...managers across corporate groups. Responsibilities include managing temporary staffing relationships, reducing agency reliance, and partnering with leaders on selection processes while ensuring compliance with HR laws and best practices. #J-18808-Ljbffr Phase2 Technology
    Temporary work

    Phase2 Technology

    Fort Worth, TX
    2 days ago
  • Vets Hired in Fort Worth, TX is seeking a Buyer/Planner to manage procurement, planning, and supplier relationships for uninterrupted...  ...candidate brings 3+ years in purchasing/planning in lean manufacturing, strong analytical and communication skills, and proficiency with... 
    Work at office

    Vets Hired

    Fort Worth, TX
    3 days ago
  •  ...role coordinates with Materials for component availability and maintains ERP/MRP planning data. Ideal candidates have 2+ years in manufacturing scheduling, strong Excel skills, and a solid grasp of load-leveling and material coordination. On-site role with competitive... 

    Carrier

    Fort Worth, TX
    2 days ago
  • Northrop Grumman in Fort Worth, TX seeks a Production Planner and Scheduler for the F-35 MUO program. This embedded role coordinates planning with multiple disciplines to manage modification/retrofit events and ensure timely milestones. Requirements include Level 2-3 experience... 

    Northrop Grumman

    Fort Worth, TX
    2 days ago

Do you want to receive more vacancies?

Subscribe and receive similar vacancies to Mfg Eng Resource Planner III (Manufacturing Technology Center). Be the first to apply!