Sign up to access all features of our service.
  • Job search
  • Favorites
  • Create a CV
    New
  • Salaries
  • Subscriptions

Manager, Production & Material Planning

$136k - $167k
Full-time

CesiumAstro

Please Note: To conform with the United States Government Space Technology Export Regulations, the applicant must be a U.S. citizen, lawful permanent resident of the U.S., conditional resident, asylee or refugee (protected individuals as defined by 8 U.S.C. 1324b(a)(3)), or eligible to obtain the required authorizations from the U.S. Department of State.

At CesiumAstro , we are developers and pioneers of out-of-the-box communication systems for satellites, UAVs, launch vehicles, and other space and airborne platforms. We take pride in our dynamic and cross-functional work environment, which allows us to learn, develop, and engage across our organization. If you are looking for hands-on, interactive, and autonomous work, CesiumAstro is the place for you. We are actively seeking passionate, collaborative, energetic, and forward-thinking individuals to join our team.

We are looking to add a Manager, Production & Material Planning to our team. In this role, you will be responsible for coordinating and overseeing production scheduling, material requirements planning (MRP), and demand/supply alignment to support program execution and on-time delivery. This role manages a team of planners and works cross-functionally to ensure accurate forecasts, material availability, planning discipline, and alignment between manufacturing capacity and program needs. Operating within a regulated aerospace and defense environment, this leader ensures compliance, drives data-driven decision-making, and supports operational efficiency and continuous improvement.

\n JOB DUTIES AND RESPONSIBILITIES
  • Oversee the development, maintenance, and execution of the master production schedule.
  • Ensure production plans align with capacity, labor availability, material readiness, and customer/program requirements.
  • Monitor schedule performance, identify constraints, and develop mitigation plans to prevent delays.
  • Support engineering changes, configuration control, and production readiness activities.
  • Lead coordination with Operations to level-load production and resolve scheduling conflicts.
  • Manage daily/weekly MRP execution to ensure accurate demand signals, planned orders, and material flow.
  • Review and validate BOM accuracy, planning parameters, lead times, and lot sizing.
  • Monitor material shortages and drive cross-functional recovery plans to maintain schedule adherence.
  • Collaborate with Procurement to resolve supplier delays, expedite needs, and strategic material risks.
  • Ensure planning data integrity to support forecast accuracy, inventory health, and system reliability.
  • Lead, coach, and develop a team of Production Planners and Material Planners.
  • Provide clear direction, workload prioritization, and performance feedback.
  • Work closely with Operations, Engineering, Procurement, Quality, and Program Management to support program success.
  • Communicate planning risks, material constraints, and schedule updates to leadership and stakeholders.
  • Support new product introduction (NPI), ramp-up planning, and operational readiness.
  • Ensure planning and scheduling practices align with AS9100 requirements, internal policies, and customer standards.
  • Maintain audit-ready documentation and data accuracy within ERP/MRP systems.
  • Identify opportunities to streamline processes, improve forecast accuracy, and enhance material flow.
  • Support root cause analysis and corrective actions for planning, scheduling, or material-related issues.
  • Reinforce standard work, process discipline, and planning performance metrics (OTD, schedule adherence, accuracy).
JOB REQUIREMENTS AND MINIMUM QUALIFICATIONS
  • Bachelor’s degree in Supply Chain Management, Business, Industrial Engineering, or related field.
  • 7-9 years with BS - Degree focus in supply chain planning or procurement experience, including 1–3 years in leadership roles.
  • Ability to prioritize workload, multitask, and meet deadlines in a dynamic environment.
  • Strong understanding of production planning, material planning, scheduling principles, and MRP logic.
  • Familiarity with aerospace/defense manufacturing processes, lead times, and configuration control.
  • Working knowledge of BOM structure, routings, capacity planning, and shop floor workflows.
  • Ability to interpret engineering drawings, planning parameters, and manufacturing documentation.
  • Problem-solving skills using root cause analysis and corrective action methodologies.
  • Experience with ERP/MRP systems (SAP, Oracle, NetSuite).
  • Understanding of FAR/DFARS and AS9100 requirements as they relate to planning and documentation.
  • Clear communication skills for cross-functional collaboration and production meetings..
\n

$136,000 - $167,000 a year

\n

CesiumAstro considers several factors when extending an offer, including but not limited to, the role and associated responsibilities, a candidate’s work experience, education/training, and key skills. Full-time employment offers include company stock options and a generous benefits package including health, dental, vision, HSA, FSA, life, disability and retirement plans.

CesiumAstro is an Equal Opportunity employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, disability, protected Veteran Status, or any other characteristic protected by applicable federal, state, or local law.

Please note: CesiumAstro does not accept unsolicited resumes from contract agencies or search firms. Any unsolicited resumes submitted to our website or to CesiumAstro team members will be considered property of CesiumAstro, and we will not be obligated to pay any referral fees.

Vacancy posted 2 days ago
Similar jobs that could be interesting for youBased on the Manager, Production & Material Planning in Westminster, CO vacancy
  • $120k - $145k

     ...build with us at Crusoe. About This Role: As the Manager, Production Planning , you will lead the production planning function for Crusoe...  ...organization, ensuring production schedules, material availability, and manufacturing capacity are aligned to support... 
    Materials
    Full time
    Temporary work

    Crusoe

    Arvada, CO
    9 days ago
  •  ...collaborative, energetic, and forward-thinking individuals to join our team. We are looking to add an Associate Manager, Production & Material Planning to our team. In this role, you will be responsible for coordinating and overseeing production scheduling, material... 
    Materials
    Permanent employment
    Full time
    Contract work
    Work experience placement
    Local area

    CesiumAstro

    Westminster, CO
    28 days ago
  •  ...Operations ownsmanufacturing planning,supply continuity, and cost across...  ...close partnership with our production and quality teams.Our ideal...  ...accuracy and turns, material cost variance, and build cycle...  ...programs to increaseoutput. Manage supply chain risk alongside procurement... 
    Materials

    Maybell Quantum

    Denver, CO
    4 days ago
  • $26 - $35 per hour

     ...Manufacturing, LLC Title of Position: Production Scheduler Position Type:...  ...through Cigna (optional HSA plan with $10 per pay period...  ...teams to incorporate materials, inventories, resource availability...  ...and make recommendations to management on various operational... 
    Materials
    Full time
    Summer work
    Casual work
    Work at office
    Night shift

    Air Squared

    Thornton, CO
    4 days ago
  •  ...Production Planner / SchedulerThe Production Planner / Scheduler owns execution-level planning inside the Assembly department of an engineered-to...  ...of the department's daily management system and runs the...  ...routines with Supply Chain on materials and shortages, and with Fabrication... 
    Materials
    Full time
    Work at office

    Kratos Industries, LLC

    Arvada, CO
    1 day ago
  •  ...Responsibilities Lead the overall manufacturing strategy, planning, and operations including Production Managers, Quality, Production Engineering, EH&S, Logistics/...  ...and forecast resources for facilities, equipment, materials, technology, and workforce to ensure sufficient... 
    Materials
    Relocation

    Kosmos

    Denver, CO
    4 days ago
  • $140k - $170k

     ...leading supplier of construction materials, proudly serving communities...  ...thrives on driving safety, productivity, and efficiency across a fast...  ...a Ready-Mix Operations Manager based in Colorado to provide...  ...efficiency Oversee business plans and manage personnel, financial... 
    Materials
    Permanent employment
    Full time
    Work at office

    BURNCO Colorado LLC

    Westminster, CO
    12 hours ago
  • $98.1k - $119.9k

     ...apply for the Water/Wastewater Project Manager role at AE2S (Advanced Engineering and Environmental...  ...engineering projects to include planning, study, design, and construction...  ...Ability to inspect equipment, structures, or materials to identify the cause of errors or other... 
    Materials
    Temporary work
    Remote work
    Night shift
    Afternoon shift

    AE2S (Advanced Engineering and Environmental Services, LLC)

    Denver, CO
    2 days ago
  • $170k - $205k

     ...What You'll Be Working On: Planning & Forecasting: Own end-to-end...  ..., board, and investor materials. Strategic Financial Modeling...  ...operational drivers such as production efficiency, utilization, and...  ...standard costing frameworks, manage inventory valuation, track variances... 
    Materials
    Temporary work
    Work at office
    2 days per week

    Crusoe

    Denver, CO
    9 days ago
  • $98.1k - $119.9k

     ...apply for the Water/Wastewater Project Manager role at AE2S (Advanced Engineering and Environmental...  ...engineering projects to include planning, study, design, and construction...  ...Ability to inspect equipment, structures, or materials to identify the cause of errors or other... 
    Materials
    Temporary work
    Remote work
    Night shift
    Afternoon shift

    AE2S (Advanced Engineering and Environmental Services, LLC)

    Denver, CO
    4 days ago
  • $22 - $28 per hour

     ...Production Planner Triple-S Steel is a family-owned business that has grown into one...  ...critical role in aligning production plans with business objectives, ensuring timely...  ...adjust production data accurately. Manage MRP (Material Requirements Planning) processes to... 
    Materials

    Triple‑S Steel

    Commerce City, CO
    1 day ago
  • $56.61k - $59.44k

     ...accountability, and operational excellence. You will manage executive calendars and communications,...  ...items, coordinate meetings, prepare materials, maintain records, facilitate travel...  ...college should consider.  Operational Planning - Have an understanding and knowledge of... 
    Materials
    Full time
    Contract work
    Work at office
    Immediate start
    Remote work

    Colorado Community College System Career Site

    Westminster, CO
    22 days ago
  • $105.64k - $223.1k

     ...KPMG is currently seeking a Manager or Senior Manager - Renewable...  ...Investment Tax Credits (48/48E), Production Tax Credits (45/45Y), Clean...  ...determinations and planning  Manage the design, execution...  ...Los Angeles County applicants: Material job duties for this position... 
    Materials
    Work at office
    Local area

    KPMG

    Denver, CO
    2 days ago
  •  ...DETAILING)/FAB process results in products that are fabricated by the...  ...shop. Work with Project Managers, Shop, and Field personnel, to...  ...employees through development planning.Assist the shop Superintendent...  ...Operations.Supervise and coordinate material procurement with purchasing... 
    Materials
    Apprenticeship
    Local area

    R.K.Industries

    Denver, CO
    3 days ago
  • $73.46k - $101.02k

     ...team. About the RoleThe Production Planner II is a mid-level position...  ...schedules, ensuring that materials, resources, and labor are...  ...guidance of senior planners and managers to ensure smooth and...  ...utilize Material Requirements Planning (MRP) and ERP systems to manage... 
    Materials
    Contract work
    Work experience placement

    Sierra Space

    Louisville, CO
    12 hours ago
  • $60.77k - $83.56k

     ...team. About the Role The Production Planner I is an entry-level...  ...schedules, ensuring that materials, resources, and labor are aligned...  ...of senior planners and managers to ensure smooth and efficient...  ...Material Requirements Planning (MRP) and ERP systems to manage... 
    Materials
    Work experience placement
    Internship

    Sierra Space

    Louisville, CO
    12 hours ago
  • $110k - $150k

     ...ensuring manufacturing readiness for new products and customer programs. Working cross-...  ...performance reviews. Develop succession plans and career development opportunities....  ...operational risk. Optimize inventory management to balance production continuity with working... 
    Temporary work
    Flexible hours
    Shift work

    Ascent Solar Technologies, Inc.

    Thornton, CO
    4 days ago
  • $28 - $36 per hour

     ...Production Planner Steel Henderson, Colorado Salary: USD 28.00...  ...fabrication shop. Work with Project Managers, Shop, and Field personnel,...  ...Assist the Production Planning Manager in ensuring that the...  ...Set up the scheduling of material procurement, processing of material... 
    Materials
    Apprenticeship
    Work at office
    Local area
    Immediate start
    Remote work

    RK Mechanical

    Henderson, CO
    3 days ago
  • Summary The Production Scheduler is the operational heartbeat of Wavelynx...  ...sits at the intersection of planning and execution: you will work...  ...demand Identify and resolve material shortages, capacity...  ...proactively with the Supply Chain Manager and contract manufacturing partners... 
    Materials
    Contract work
    Temporary work
    Shift work

    Wavelynx

    Broomfield, CO
    2 days ago
  • $95k - $115k

     ...Production Planner Crusoe is on a mission to accelerate the abundance of energy and intelligence...  ...the reconciled Sales and Operations Planning (S&OP) plan into a real, capacity-...  ...Schedulers who release work orders and manage floor sequencing. Schedule Adherence... 
    Full time
    Temporary work
    Work at office
    Shift work

    Crusoe

    Arvada, CO
    1 day ago
  • $216.89k - $298.22k

     ...programs into high-rate, repeatable production across a diversified portfolio...  ...future growth. Lead capacity planning, facility buildout, and...  ...Facilities, Security, and Program Management to ensure aligned production readiness, material flow, supplier integration, and... 
    Materials
    Full time
    Contract work
    Work experience placement

    Sierra Space

    Louisville, CO
    4 days ago
  • $27 - $34 per hour

     ...keeping things moving? This Production Planner opportunity is a...  ...with experience in production planning, scheduling, or inventory who...  ...in an ERP system and managing multiple priorities. This is...  ...production orders, inventory, materials, and scheduling \n Help plan... 
    Materials
    Hourly pay
    Temporary work
    Monday to Friday

    Verstela

    Golden, CO
    11 days ago
  •  ...Hiring Demand Generation and Marketing Manager Remote - MUST be in one of these states:...  ...Manager . This role is responsible for planning and executing multi-channel lead...  ...growth. Working closely with sales and product marketing, this position focuses on lead... 
    Full time
    Temporary work
    For contractors
    Remote work

    AimHire

    Denver, CO
    1 day ago
  • $50k - $60k

     ...show operations, event project management, learning administration,...  ...biographies, headshots, presentation materials, registration information,...  ...preparation calls and planning meetings. Support development...  ...partnering with industry-leading product and solution providers,... 
    Materials
    Contract work
    Summer work
    Live out
    Work at office

    PSA Security

    Westminster, CO
    more than 2 months ago
  • $140.7k

     ...Lead Technologist/ Project Manager – Energy Solutions AdvisoryThe energy space is undergoing...  ...teams with proposals or other materials for new business opportunities.Here's what...  ..., exploration, concept, and development planning for energy projects, including knowledge... 
    Materials
    Full time
    For contractors
    Work at office
    Remote work

    Jacobs Solutions

    Denver, CO
    12 hours ago
  • $200k - $250k

     ...and liaising with executive management to make decisions for operational...  ...of long- and short-range planning, policies, programs, and...  ...Achieves optimum employee production levels through direct leadership...  ...demonstrate thorough knowledge of materials, methods, and equipment used... 
    Materials
    Work experience placement
    Work at office
    Local area

    Quanta Infrastructure Solutions Group, LLC

    Denver, CO
    12 hours ago
  • $150k - $185k

     ...Operations Manager Steel Henderson, Colorado Salary: USD...  ...required Pre-Construction, Planning & Preparation, Execution & Control...  ...Agreements. Ensure material/equipment/fixture management...  ...labor resource loading and productivity tracking are implemented updated... 
    Materials
    Contract work
    For contractors
    Apprenticeship
    For subcontractor
    Local area
    Immediate start

    RK Mechanical

    Henderson, CO
    1 day ago
  • $7,000 per month

     ...Description The Wealth Management Operations Associate provides full support to one or...  ...responsibilities include data collection for financial planning, investment analysis & operations, trade...  ...months of employment. All costs (study materials & exam) are covered by the employer.... 
    Materials
    Work experience placement
    Work from home

    Longwise Wealth Partners

    Lakewood, CO
    23 hours ago
  •  ...Restocking supplies Ordering food or supplies Printing materials Relationships with the Storyline Team: I report to...  ...Ability to handle administrative tasks Familiarity with Planning Center Disclosure: We are committed to providing a safe... 
    Materials
    Full time
    Temporary work
    Live in

    Storyline Church

    Arvada, CO
    more than 2 months ago
  • $160k - $200k

     ...durable, and self-contained products. Our jobsite solutions include...  ..., wheel chocks, hazardous materials storage, hazard signage, emergency...  ..., quality, maintenance, planning, warehouse operations, and...  ...kaizen events and ensure visual management and accountability systems... 
    Materials
    Temporary work
    Work at office
    Local area
    Flexible hours

    Justrite Safety Group

    Broomfield, CO
    1 day ago

Do you want to receive more vacancies?

Subscribe and receive similar vacancies to Manager, Production & Material Planning. Be the first to apply!