Sign up to access all features of our service.
  • Job search
  • Favorites
  • Create a CV
    New
  • Salaries
  • Subscriptions

Toyota Production System Manager

$120k - $145k
Full-time

Talent Search Group, Inc

Toyota Production System (TPS) Manager- $120-$145k plus bonus and relocation

Lean Manufacturing Implementation Manager

Position information

Location

Shelby, North Carolina (on-site; periodic travel to Mooresville, NC)

Position type

Full-time, salaried

Department

Manufacturing / Operations

Compensation

Competitive base salary, annual bonus tied to the performance measures below, benefits, and relocation assistance.

Work authorization

Must be a U.S. person under ITAR (the U.S. defense export rules)

ABOUT OUR CLIENT

Our client designs and builds armored vehicles for government, defense, law enforcement and commercial customers. Our Shelby, North Carolina plant builds on Ford and other commercial chassis and covers laser cutting, welding, machining, paint, and final assembly. Production is high-mix, low-volume and build-to-order: several vehicle programs run at the same time, each with its own configuration, labor content and customer milestones.

POSITION OVERVIEW

We are seeking a hands-on TPS Manager to lead the implementation of the Toyota Production System across the Shelby plant. This person will turn TPS principles into daily practice on the shop floor, adapted to a high-mix, low-volume vehicle build environment. We need someone who has built TPS in a real plant and can evaluate how vehicles are built today, develop an implementation plan, and work alongside management and the production workforce to deliver measurable results.

This is an implementation-focused leadership position, not simply a process auditing or consulting role.

They already defined a production and quality operating model built on Quality Gates, Layered Process Audits, a weekly Open Points List, 8D problem solving and engineering change control. The TPS Manager will run and strengthen that system and build TPS on top of it, so that lean and quality operate as one system rather than in parallel.

KEY RESPONSIBILITIES

TPS implementation

• Lead the implementation and continuous development of TPS throughout the Shelby facility.

• Establish takt time by vehicle program and balance work across fabrication, paint and assembly.

• Level the production mix across programs (heijunka) so each work area receives an even, predictable load.

• Design and implement kitting by vehicle and station, supermarkets for common hardware, and pull between fabrication and assembly.

• Implement andon (stop-and-call) at each station with a defined team-leader response, and build the team leader structure to support it.

• Apply jidoka and poka-yoke (error-proofing) at the steps where defects originate.

• Introduce and sustain 5S and visual management, including vehicle build boards, line boards and area stand-up boards.

Standard work and their quality system

• Establish standardized work for each operation, with operators involved in writing and improving their own standards.

• Run and maintain the Quality Gates (G0–G6), Layered Process Audits and the weekly Open Points List (OPL).

• Lead or coach 8D root-cause investigations for significant defects, and use 5-Why and fishbone analysis for everyday problems at the line.

• Connect improvements to engineering change control (ECR/ECN), so that kaizen changes update work instructions, Quality Gate criteria and training records.

Continuous improvement

• Lead kaizen events and build a daily, worker-led improvement system with a simple process for submitting and implementing ideas.

• Develop value stream maps for each vehicle program and identify and remove the seven wastes.

• Reduce labor hours per vehicle, rework, build cycle time and work-in-progress.

• Improve equipment performance and uptime in the laser cutting and machining cells.

Leadership and people development

• Train and mentor supervisors, team leaders, engineers and technicians on TPS principles and tools.

• Establish daily tiered accountability meetings and leader standard work, including regular floor walks.

• Build internal ownership so the system continues to run and improve without depending on one person.

• Partner with engineering, quality, purchasing, materials and program management.

AUTHORITY

• Authority to hold a vehicle at a Quality Gate when acceptance criteria or required evidence are not met.

• Approval of standard work and work-instruction changes arising from improvement activity, in line with the ECR/ECN process.

• An annual improvement budget, with limits to be confirmed by leadership.

• Works alongside any outside consultant engaged for TPS implementation and serves as their internal owner of the system.

FIRST 90 DAYS

Timeframe

Expected outcome

First 30 days

Map the value stream for each vehicle program, set takt time by program, and assess current standard work, material flow and Quality Gate performance.

First 60 days

Pilot standard work, station kitting and an andon stop-and-call system on one line, with a defined team-leader response.

First 90 days

Daily tiered meetings and production boards running across the plant; present a 12-month TPS roadmap with KPI targets to leadership.

KEY PERFORMANCE MEASUREMENTS

Area

Measure

Safety

Recordable injuries and near-miss reporting; safety comes first in the daily review

Delivery

On-time delivery against committed vehicle milestones

Productivity

Labor hours per vehicle compared with standard, by program

Quality

First-pass yield at each Quality Gate (G0–G6) and rework hours per vehicle

Flow

Vehicles in work-in-progress and total build cycle time

System discipline

Open Points List items closed on time and Layered Process Audit completion

Engagement

Employee improvement ideas implemented per month

QUALIFICATIONS

• 7+ years of manufacturing experience in TPS, lean manufacturing or operational excellence.

• At least one ground-up TPS or lean implementation in an assembly environment, with measurable results.

• Working knowledge of takt time, standard work, kitting, kanban, heijunka, andon, 5S, value stream mapping and waste elimination.

• Experience leading structured problem solving (8D, 5-Why, A3) and working within engineering change control.

• Strong leadership, coaching and communication skills at every level, from technician to executive.

• Willingness to work on the shop floor every day and lead change directly.

• Bachelor’s degree in manufacturing engineering, industrial engineering, operations management or a related field preferred.

PREFERRED EXPERIENCE

• Previous experience at Toyota or a Toyota supplier, or formal TPS training.

• High-mix, low-volume assembly in specialty vehicles, defense, truck upfitting, fire apparatus, buses or aerospace, including welding, fabrication and paint.

• Background in ISO 9001, AS9100 or IATF 16949 quality systems; a Lean Six Sigma belt is a plus.

Vacancy posted 2 days ago
Similar jobs that could be interesting for youBased on the Toyota Production System Manager in Shelby, NC vacancy
  •  ...Description Job Description Job Title: Quality & Business Process Manager Job Summary: The Quality & Business Process Manager is responsible for overseeing and optimizing quality management systems, business processes, financial workflows, and cross-functional... 
    Suggested
    Temporary work

    Arthur Services, Inc.

    Shelby, NC
    28 days ago
  • $84k - $126k

     ...responsibility to achieve facility goals eg production quality safety and implement operational...  ...others when neededSupervise and manage associates and leaders in area of responsibility...  ...processingOversee the execution of systems operations by ensuring appropriate hardware... 
    Suggested
    Full time
    Temporary work
    Part time
    Local area

    Walmart

    Kings Mountain, NC
    4 days ago
  • $99k - $143k

    Actuation Systems Engineer, LeadWe are looking for a Systems Engineer to join our Shelby team...  ...actuation applications. Establish and manage requirements database aspects for critical...  ...Culture *Your ChallengeWork within product development teams to support equipment mechanical... 
    Suggested
    Full time

    Curtiss-Wright

    Shelby, NC
    5 days ago
  •  ...Club Operations Manager Oversees Club operations and programs with primary concern for program development and implementation; staff...  ...May be responsible for managing human resources programs and systems including recruitment, employee relations, compensation and benefits... 
    Suggested
    Work experience placement

    Boys & Girls Clubs of America

    Shelby, NC
    2 days ago
  • $99k - $143k

     ...quantitative reliability prediction assessments for component and system designs; Perform safety analyses, hazard analyses, common mode...  ...PlanIInclusive & Supportive Culture *Your ChallengeWork within product development teams to support equipment mechanical and... 
    Suggested
    Full time

    Curtiss-Wright

    Shelby, NC
    5 days ago
  • Enterprise Mobility is hiring immediately for its Management Training Program in Shelby, NC. As an MT, you will learn the business from day one, serving as both the front-facing representative to customers and the behind-the-scenes operations expert at a neighborhood branch... 
    Immediate start

    Enterprise

    Shelby, NC
    1 day ago
  •  ...to keep its lending processes accurate and efficient. You will review, book and maintain commercial and consumer loans in the core system, prepare and check loan documentation, and make sure every file meets bank policy and regulatory requirements. Day to day, you will... 
    Permanent employment
    Full time

    gpac

    Shelby, NC
    4 days ago
  • $84k - $126k

     ...business plan for area of responsibility to achieve facility goals eg production quality safety and implement operational improvements Forecast...  ...own judgment or consulting others when needed Supervise and manage associates and leaders in area of responsibility by giving... 
    Full time
    Temporary work
    Part time
    Local area

    Walmart

    Kings Mountain, NC
    4 days ago
  • $84k - $126k

     ...existing and upcoming digital applications and systems technology innovation trends and...  ...regulatory visits and prepares audit reports for management review Assists in integrating...  ...excellence to protect our people, property, and products. You will develop and execute asset... 
    Full time
    For contractors
    Work at office
    Local area

    Walmart

    Kings Mountain, NC
    3 days ago
  • $130k - $190k

    Eaton’s IS VEH VGNA division is currently seeking a Operations Manager. This is a full time on-site position at our Kings Mountain,...  ...considerations. The Operations Manager oversees all aspects of production operations for Kings Mountain, NC. This role leads the manufacturing... 
    Full time
    H1b
    Local area
    Visa sponsorship
    Relocation package

    Eaton Corporation

    Kings Mountain, NC
    2 days ago
  •  ...processing, truck deliveries and allocation of product to departments, adhering to productivity...  ...and usage of company standard software, systems, and procedures # Inspiring and...  ...ability to plan, organize, prioritize, and manage multiple tasks efficiently # Utilization... 
    Full time
    Flexible hours
    Night shift
    Weekend work
    Day shift
    Early shift

    bealls

    Shelby, NC
    1 day ago
  • $25 per hour

     ...the Abraxas philosophy and mission and promotes the Seven Key Principles of care. Demonstrate appropriate use of Safe Crisis Management techniques and skill Who We're Looking For You may be a great fit if you are: · Compassionate and professional · Dependable... 
    Hourly pay
    Full time
    Local area
    Shift work
    Weekend work

    Abraxas Youth & Family Services

    Shelby, NC
    10 days ago
  •  ...office processes and continue to strive to improve processes and enhance efficiencies for all entities we serve.Key Responsibilities:Manage daily data exchange with federal gateways and entities (SAIG, COD). Load, process, and monitor application records (ISIR’s) and... 
    Work at office
    Local area
    Flexible hours

    Gardner-Webb University

    Boiling Springs, NC
    3 days ago
  • $22.5 per hour

     ...technician.Responsible for operating pharmacy systems to obtain patient and drug information...  ...training, coaching, and performance management of pharmacy technicians. Makes decisions...  ...greeting them and offering assistance with products and services. Resolves customer... 
    Hourly pay
    Full time
    Work experience placement
    Local area
    Flexible hours
    Afternoon shift

    Walgreens

    Shelby, NC
    3 days ago
  • $92k - $138k

     ...PermanentCompany: WalmartBusiness Segment: Supply ChainOversees and manages productivity of area of responsibility by preparing reviewing andor...  ...equipment for example material handling equipment pneumatic systems electrical systems air compressors general building... 
    Full time
    Temporary work
    Part time
    For contractors
    Local area

    Walmart

    Kings Mountain, NC
    5 days ago

Do you want to receive more vacancies?

Subscribe and receive similar vacancies to Toyota Production System Manager. Be the first to apply!