Level 3 Central Office Installation Tech - North/Central New Jersey
Adex
Level 3 Central Office Installer
Location: North/Central New Jersey
Installation Technician Level 4 will be required to perform all intermediate and advanced installation work activities. The Installation Technician Level 4 should have a clear understanding of all Installation and Quality Standards contained in GR-1275 and NSTD119 Standards as well as specific Company and customer local requirements.
Duties and Responsibilities:
- Work with minimum supervision and be certified in Skill levels 1, 2 and 3
- Input job status, issues and requests and all expense-related information into the Project Management platform
- Reconcile materials for sales order using web based inventory control forms
- Understand the scope of work and customer expectations as well as the profitability objectives and timeframes
- Control all on-site aspects of the job and work closely with the Installation Supervisor or Project Manager to ensure customer satisfaction
- Understand the scope of work of the job as well as the efficiency expectations given by the Installation Supervisor or Project Manager
- Interface directly with the Installation Supervisor or Project Manager and Engineering Department to resolve any order issues
- Correct job specifications, drawings, documentation and record all changes in the Project Management platform
- Maintain tools assigned to the job as well as monitor tool calibration requirements
- Perform hardware testing, such as power verification, device provisioning and system tests
- Responsible for all work meeting all customer standards
- Meet or exceed customer and internal documented acceptable levels of quality
Knowledge, Skills and Abilities:
- Lead Installation Technician should have minimum 5 years Data Center/PoP/CO installation experience
- Should possess a good mechanical aptitude
- Should possess a good knowledge of basic power tools
- Should have the ability to adapt to various work environments
- Should have good knowledge of optical routing equipment installations
- Should have good knowledge of fiber optic cable installation & testing practices
- Should have good knowledge of AC/DC power
- Should have good knowledge of infrastructure installation work (equipment racks, cable racks and fiber duct etc.)
Credentials and Experience:
Requires minimum of 5 years of Data Center/PoP/CO installation experience
Physical Demands:
- The employee will be required to use his/her hands 50% of the time to type, write, and handle paperwork
- The employee will be required to climb and work off of ladders
- The employee will be required to work under raised floors
- The employee will be required to cut and drill metal and concrete
- The employee must be able to distinguish between different colors
- The employee will be possibly riding in a company vehicle to and from customer sites, sitting at a desk 10% of the time with walking between offices and other work areas from time to time and working in tight spaces that include computer network infrastructure
- The employee may, from time to time, be required to lift weight (i.e., paper boxes and installation materials) up to 50 pounds
- Close vision (clear vision at 20 inches or less) is generally required, as the employee will be working at a computer, working with files & paperwork, working with tools and working on specialized computer & networking devices
Vacancy posted more than 2 months ago
Do you want to receive more vacancies?
Subscribe and receive similar vacancies to Level 3 Central Office Installation Tech - North/Central New Jersey. Be the first to apply!
Related searches
